Conceptual estimating is the work of pricing, sequencing and de-risking a building before design drawings exist, usually off nothing more than a massing model and a program.

The best precon teams don’t wait for drawings. They run scenarios off known historical projects from past projects. What follows is how they describe that work, in their own words.

What do precon teams actually price before drawings exist?

Three things, every time: structure, skin and systems. Pre-construction planning at the massing stage is a scenario exercise, not a takeoff.

“When we get brought in at this stage of the game, we’re always asked, well, what if we do cast in place concrete? What if we do post tension? What if we do steel? What if we do mass timber? Then the skin. Can we afford precast, do we go to GFRC? And then HVAC. Those are the three biggest things we’re asked to look at very early on, when just doing massing studies.”

Preconstruction leader, California general contractor

None of that is on a drawing. It is in the general contractors accounting systems, curated by the estimator’s experience, applied to the clients gross floor area targets.

Why does the design get rebuilt for conceptual estimates?

Because the design model and the cost estimate are two different files, owned by two different teams, so every revision forces a rebuild of the estimate.

“If we’re creating that model for cost estimating based on something a design team has created in maybe a day and a half, that’s another two to three days on the estimating side.”

Design lead, integrated design-build firm

That lag is the whole problem. Design moves in hours; the estimate comes back in days; the decision gets made in between. We’ve written about how estimators actually price a concept design. The short version is that cost is already the main input they think in. It just shows up last on paper.

What changes when quantities live in the design model?

The rebuild disappears, and precon stops being a bottleneck on its own what-if scenarios.

“If you’re just giving me quantities, I’m going to go build another model. The value is in having my model connected to my cost.”

National Director of Preconstruction, integrated design-build firm


Separate models

One shared model

Scenario turnaround

Days

Hours or less

Who holds the quantities

Precon, after a rebuild

Everyone, as the design moves

Where precon input lands

After the scheme is sold

At the massing move

This is what constructible design means in practice for a GC: cost and quantities are native to the model, so preconstruction teams plan against the same geometry the designer is editing. See how it fits alongside the rest of your stack in our preconstruction software guide.

FAQ

What is conceptual estimating? The scoping, budgeting, scheduling and constructability work a builder does before construction documents exist, often starting at feasibility or massing.

When should precon get involved in design? At the first massing move. Every structural, skin and systems decision made before precon sees the model is a decision made without cost in the room.

What should a precon team expect from a design tool? Quantities and cost that update with the geometry, without an export or a rebuild.