The VE process, and how to minimize it

The VE process, and how to minimize it

The VE process, and how to minimize it

Team Arcol


The value engineering process is a structured review that improves a project’s function-to-cost ratio.

VE has a legitimate job. What has grown around it is surprise VE: stripping a scheme that was sold before anyone priced it. You can’t eliminate VE. You can shrink it back to its real job.

What is the value engineering process?

The formal VE process runs in stages: gather information, analyze function, generate alternatives, evaluate them, develop the best ones, and present recommendations. Value engineering analysis, done properly, asks what each element is *for* and whether there is a better way to deliver that function at lower cost.

That is useful work. Owner-driven scope decisions are useful work. Neither is the problem.

Where does the VE process go wrong?

It becomes a scheduled phase, run late, to close a gap that was created early. The scheme gets sold on a rendering, priced weeks later, and the VE workshop is where the team pays a second time for a building it already designed once. We made the full argument in value engineering is a receipt, not a phase.

“You oftentimes will get a client that says, I want windows everywhere. Well, okay. As the builder, we know that if you want windows everywhere, you basically have to up your HVAC system to a point where it’s well over budget. This isn’t the kind of thing that shows up in a design.”

Preconstruction leader, California general contractor


VE by design

VE by surprise

When it happens

Throughout, as options are weighed

Late, after the scheme is sold

What it analyzes

Function vs. cost of real alternatives

How much to strip to hit a number

Who initiates

The team, deliberately

The estimate, when it finally arrives

Effect on the client

Confidence

Damage

How do you minimize value engineering?

Keep cost in the room while the wall is still cheap to change. Not every design will pencil on the first pass, but a scheme priced as it is created arrives at VE with far less to cut, because the structure, skin and systems decisions were made with the number visible.

That is what constructible design does: live cost metrics that update with the design, so the designer and the estimator are looking at the same number at the moment of the decision. Cost becomes an input, and VE goes back to being function analysis instead of damage control.


FAQ

What is value engineering analysis? The functional analysis step of VE: identifying what each project element does and evaluating alternatives that deliver the same function at lower cost.

Can value engineering be eliminated? No, and it shouldn’t be. Owner scope decisions and genuine function analysis are part of every project. Surprise VE caused by designs sold without cost is what can be minimized.

What causes excessive value engineering? A gap between when the design is committed and when it is priced. The longer that gap, the larger the VE phase.